We have successfully implemented numerous laboratory projects for many well-known companies and EPC contract partners (Engineering, Procurement, Construction) in the Oil & Gas sector – Petrochemical Industries, Smelters, Food Labs, Academic, Sewage, Environmental, Third-party Commercial Labs and many more. As a premier laboratory Turnkey solution provider, we bring unmatched expertise to every project. We work with you to plan and realize your own testing laboratory. Our efforts are focussed to cater to individual requirements and tailored to achieve desired output as per Turnkey laboratory design, within the deadline of the project, and with standard testing methods.
Why BDH Middle East for Turnkey Laboratory Solutions

Overall responsibility for your individual & turnkey laboratory solution:
- Identify and define space utilization based on space occupancy
- Develop turnkey lab interiors by designing furniture layouts and space plan for optimal circulation and workflow requirements
- Recommend equipment for proper ventilationÂ
- Planning for all the lab’s needs, from workspace and storage to equipment and materials



We cover complete scope of work as below
- BOM finalization based on analysis of required testing methods based on the design inputs, project specification, sample schedules
- Utility requirements of all selected analyzers such as Electrical, Gases, Water, Exhaust Systems, Bench Work space, Fumehood Systems, etc.,
- Design of laboratory layout based on the applications and EHS (Environment Health Safety).
- Deliver, Install, Commissioning, Testing of Laboratory Furniture, Fume Hoods, Gas Distribution System and Analyzers with required support instruments.
- Training and Service support.
- LIMS – Laboratory Information Management System (LIMS) with all the required hardware such as Lab Networking, HMI (Human Machine Interface), Server, Switches
Lab Architecture

Analyzers and Instruments


LIMS Software
Laboratory Information Management Systems (LIMS) help with large volume of lab data management and adherence to strict standards, while improving efficiency and turnaround times, enabling automation and neglecting human errors.

FAT – Factory Acceptance Test
Exhaust Systems, LIMS, GDS, equipment meets its designed purpose. The FAT validates the operation of the equipment and makes sure the customers’ purchase order specifications and all other requirements have been met.
We document the FAT based on the below process.
- Customer scope and specifications
- Drawings (GA, Layouts, etc.)
- Data Sheets
- ITP (Inspection Test Plan)
- Applicable Codes / References
- Checklists and Procedures specific to the FAT
- Calibrations and Certifications as required by contract
Installation and Commissioning
We have a very diverse and experienced team of Engineers to perform the Installation, Commissioning, Testing all the supplied systems as per the design inputs, specification and Test methods.
We document the Installation and commissioning based on the below process:
- BOM verification
- Prerequisite check for all analyzers systems
- SAT (Site Acceptance Test) Procedure
- Calibration at site